> ## Documentation Index
> Fetch the complete documentation index at: https://docs.nyumbazetu.com/llms.txt
> Use this file to discover all available pages before exploring further.

# IoT smart meters setup process

> Register meters, assign them to units, and verify readiness for live reading collection.

Use this tab to keep meter records correct before operations and billing.

## What this process does

* Stores meter identity and assignment details
* Links meters to units and vendors
* Tracks active state and controllable capability

## Setup checklist

1. Create or update meter records with serial/meter numbers.
2. Assign each meter to the correct unit and branch.
3. Attach the correct vendor profile.
4. Confirm active/inactive status is correct.
5. Test control capability (if valve control is supported).
6. Verify the meter appears in readings after polling.

## Good practices

* Use a consistent naming standard for meter labels
* Deactivate retired or replaced meters quickly
* Recheck assignments after tenant or unit changes

## Done when

* Every active unit meter is correctly mapped
* Vendor and control settings are valid
* Readings can be collected reliably
